Weekly Roadwork Report – TxDOT Atlanta District For March 29, – April 4
When traveling around the region this week be advised of road construction in our area.
Bowie County
SH 8 – At Sulphur River, replacing bridges.
FM 559 – Between College Drive and Robison Road, installing sidewalks.
Cass County
SH 8 – At Sulphur River, replacing bridges.
Harrison County
I-20 – At Potters Creek, conducting preventative maintenance work on bridges.
SH 43 – From Loop 390 to Haggerty Creek, repairing and resurfacing highway.
US 59 – From Marion County Line to Woodlawn Oaks Road, installing median barrier.
Morris County
SH 49 – From Titus County Line to FM 144, repairing and resurfacing highway.
Panola County
SH 149 – At SH 315, constructing overpass and widening highway.
US 59 – At SH 149 interchange, concrete pavement replacement. Westside entrance and exit ramps closed. Detours in place.
US 79 – From FM 31 to Louisiana State Line, resurfacing highway.
Titus County
SH 49 – From FM 1735 to Morris County Line, repairing and resurfacing highway.
Upshur County
US 271—From Camp County Line to 0.5 miles north of FM 2088, resurfacing highway.
FM 1844—At 0.4 mile east of US 271, repairing culvert. Highway closed due to flood damage.