Some routine maintenance may inconvenience area motorists over the next few weeks. Specifically work will be done this Wednesday, September 30 from 7AM to about 7PM or until the work is finished.

The entrance ramp from Walton Drive to I-369/US 59 South in Texarkana will be closed to traffic as workers crack seal joints on the bridge portion of the ramp.

Traffic will be detoured further down Walton Drive to the next entrance ramp. The construction schedule and ramp closure can change due to inclement weather or other unforeseen problems.
Workers will crack sealing joints on bridges and overpasses in and around the interchange of I-30 and I-369/US 59 over the next few weeks requiring various closures of these structures to traffic. This is a routine maintenance project, but will be effecting local traffic as the work requires the structures to be closed to traffic while the work is be done.
Anyone having any questions about the road closure, detour routes or construction work may call the Texas Department of Transportation Texarkana area office at 903-838-8574 for more information.

More From Eagle 106.3